Skip to content

Cedarburg High School

Long-Range Master Plan, Referendum, Revisioning Schools | Cedarburg, WI

Cedarburg High School currently uses two separate spaces divided by a kitchen as their cafeteria. Aside from the inherent difficulties of maintaining and supervising two spaces, neither of these rooms, separate or combined, can comfortably accommodate the volume of students currently enrolled.

The new cafeteria design relocates the kitchen and expands on the area currently utilized for cafeteria. In addition to the new kitchen and cafeteria, a new entry atrium was designed as a more student-oriented entrance which is adjacent to the student parking lot. 

While the design takes subtle cues from other elements of the existing school, it will stand out as an innovative and exciting setting for students and visitors.

Portfolio

Completion

2021

Square Footage

19,000

Services

Branding
Design Development
Consensus Building
Construction Documents
Furniture Consultation
Full Architecture
Graphics
Interior Design
Master Planning
Programming
Schematic Design
Signage
Site Planning
Space Planning
Wayfinding

Related Work

Transcenter / Escuela Verde
Private K-12

Transcenter for Youth

Transcenter / Escuela Verde is a charter school designed for 100 students in grades 7 through 12 based on the “Edvision Project Based Learning Model.”

Early Childhood/Daycare

Casa de Corazon Daycares

GROTH Design Group has worked on numerous projects under the Casa brand, including multiple daycare locations in both Wisconsin and Minnesota.