
School District of Cudahy Projects
GROTH Design Group assisted with a year-long study to redefine facilities for Technical Education the Family & Consumer Sciences (FACS) programs in Cudahy High School.


















Scroll
Cedarburg High School currently uses two separate spaces divided by a kitchen as their cafeteria. Aside from the inherent difficulties of maintaining and supervising two spaces, neither of these rooms, separate or combined, can comfortably accommodate the volume of students currently enrolled.
The new cafeteria design relocates the kitchen and expands on the area currently utilized for cafeteria. In addition to the new kitchen and cafeteria, a new entry atrium was designed as a more student-oriented entrance which is adjacent to the student parking lot.
While the design takes subtle cues from other elements of the existing school, it will stand out as an innovative and exciting setting for students and visitors.
Completion
2021
Square Footage
19,000
Branding
Design Development
Consensus Building
Construction Documents
Furniture Consultation
Full Architecture
Graphics
Interior Design
Master Planning
Programming
Schematic Design
Signage
Site Planning
Space Planning
Wayfinding

GROTH Design Group assisted with a year-long study to redefine facilities for Technical Education the Family & Consumer Sciences (FACS) programs in Cudahy High School.

Planning and design of the science wing expansion is intended to meet functional needs for classroom space and high expectations.

This new three-story facility for the Notre Dame School Campus provides classroom space for up to 450 elementary and middle school students.