
Shepherd of the Prairie Lutheran Church
The Phase II educational addition was undertaken with GROTH Design Group and preschool, music and youth program spaces were accommodated with an expansion.




Scroll
The first phase of a multi-phase expansion includes a single-story addition to the south end of Pilgrim Lutheran’s school campus. The addition includes a new classroom space, an administrative center (reception area, workroom, offices, conference room, health room, and staff restroom), new restrooms, and the gathering space for a future sanctuary that will be used for fellowship and education space until the sanctuary is constructed in a second phase.
A conceptual master plan for the campus expansion project was completed by GROTH Design Group.
Phase 1 will also includes parking on the north and south ends of campus, the extension of the school drive, the replacement of the existing school floors, and a new storage room on the northwest side of the gymnasium.

The Phase II educational addition was undertaken with GROTH Design Group and preschool, music and youth program spaces were accommodated with an expansion.

This new 14,000-square-foot Family Life Center is comprised of a 500 seat contemporary worship space/multi-purpose space, and a 5,400-square-foot administrative wing.

Nativity of Our Lord parish had two worship and school locations. The parish is moving toward one location on the downtown worship site.