Skip to content

RUSD- Red Apple School

STEaM Focused K-8 Education Spaces | Racine, WI

 As part of a large district-wide master plan, GROTH Design Group partnered with Racine Unified School District to design the new Red Apple STEAM School. The project will relocate the existing school to a different neighborhood within the City of Racine while expanding the grades and number of students served within the building. Working closely with the District and City, GDG developed multiple site concepts that maximized the usage of the urban parcels and focused on the strong partnership between RUSD and other neighborhood organizations.


Racine Unified School District prioritizes STEaM education and is providing state-of-the-art learning spaces.

Highlight areas in the building include: the community classroom which is accessible outside of the school day via a secure vestibule, a second-floor atrium and rooftop garden providing different ways for students to interact with the science of the natural world, the STEaM gallery and multiple makerspaces directly adjacent to the library, and centralized collaboration spaces accessible to every grade level.

The building will also be utilized as a teaching tool with different systems (structural, mechanical, electrical, and plumbing) identified throughout various areas and storefront windows displaying mechanical rooms within academic zones.

Portfolio

Completion

2025

Square Footage

123,000

Services

master planning
Adjacency Study
Design Development
Conceptual Renderings
construction Documents
consensus building
Furniture Consultation
Interior Design
schematic Design
programming
Graphics/Branding
site Planning
Construction Administration

Related Work

Christ Presbyterian Church
Churches

Christ Presbyterian Church

Christ Presbyterian renovated nearly every square foot within the existing church facility and added new spaces to address concerns for neighborhood proclamation.

Holy Apostles Chapel
Award Winner

Holy Apostles Chapel

Involved from concept through construction administration, GROTH Design Group has tied the new 30-person chapel into the architecture of the church.

St John XXII Campus rendering
Private K-12

St. John XXII Campus

The desire to improve the quality of its educational facilities prompted the St. Francis of Assisi Parish to combine its 3 schools into a new 21st century facility.